Last Update:
Dec 10, 2025
Share
82% of unplanned industrial downtime involves HMI failure—making SCADA UX design critical for operational safety and efficiency
SCADA operators experience 340% higher cognitive load than office workers during peak periods—requiring specialized design approaches
71% of industrial accidents involve interface design failures that could have been prevented through better visual hierarchy
SCADA design changes take 6-12 months versus SaaS's rapid iteration—formal validation and regulatory approval required
Properly designed SCADA interfaces reduce operator errors by 58% and decrease training time by 64% on average
64% of industrial control systems run on 10+ year old hardware—design must accommodate legacy platform constraints
38% of SCADA deployments face regulatory delays due to inadequate usability documentation per compliance standards
Top agencies charge $150-300/hour with projects ranging $30K-$500K+ depending on complexity and compliance requirements
Saasfactor's Exowatt case study shows 40% faster anomaly detection and 60% increased development velocity in mission-critical SCADA
Platform-specific expertise delivers projects 38% faster—deep knowledge of FactoryTalk, Wonderware, and Ignition platforms matters
Introduction
SCADA (Supervisory Control and Data Acquisition) systems function as the nervous systems of modern industrial operations. They manage power grids, renewable energy installations, manufacturing facilities, oil and gas operations, and water treatment plants.
Unlike consumer-facing SaaS applications where engagement drives retention, SCADA systems operate in high-stakes environments. A single interface mistake can cost millions in downtime or endanger human lives.
According to a study by ARC Advisory Group, 82% of unplanned industrial downtime events involve some element of human-machine interface failure.
Selecting the right UX design agency for your SCADA software isn't about aesthetics or user engagement metrics. It's about finding partners who understand the fundamentally different design paradigm required for real-time industrial control systems where operators work under extreme time pressure, cognitive load remains relentless, and errors cascade through critical infrastructure.
This comprehensive guide reveals the top 10 UX design agencies specializing in SCADA and industrial HMI design, evaluates them against rigorous criteria including portfolio product market value, pricing models, and collaborative approaches, and explains precisely why SCADA design demands different expertise than designing SaaS products.
Why SCADA UX Design is Fundamentally Different from SaaS Design
Before evaluating agencies, you must understand the profound difference between designing interfaces for collaborative business software versus industrial control systems. The distinction isn't marginal—it's existential.
Core Differences: SCADA vs. SaaS UX Design
1. Consequence of Error
SaaS Environment: A user misclicks a button in Slack or HubSpot. They undo the action, learn from the mistake, and move on. The worst outcome is a lost email or deleted contact.
SCADA Environment: An operator misreads a pressure gauge visualization and fails to shut down a pumping station. The result: pipeline rupture, environmental catastrophe, potential fatalities.
Research from the MIT Human Systems Laboratory shows that 71% of industrial accidents involve interface design failures that could have been prevented through better visual hierarchy.
This fundamental difference means SCADA designers must employ hazard analysis and risk mitigation at every screen. The design process includes formal risk assessments (ISO 14971), hazard-related use scenario identification, and usability validation against failure modes.
2. User Profile and Expertise
SaaS Users: Knowledge workers who chose to use your software. They have time to learn tutorials, explore features, and adapt to design changes during business hours with reasonable cognitive resources.
SCADA Operators: Highly trained technicians managing life-critical systems, often working 12-hour shifts under emergency conditions. According to industrial ergonomics research from Purdue University, SCADA operators experience cognitive load levels 340% higher than typical office workers during peak operational periods.
They must make split-second decisions based on incomplete information. They don't have time to learn your interface—they need to operate it intuitively under cognitive stress.
Key Difference: SaaS design prioritizes onboarding and discoverability. SCADA design prioritizes instant comprehension and error prevention through constraint design.
3. Real-Time Data Complexity
SaaS Dashboards: Display static data, user-generated content, or historical analytics. Users consume information at their own pace. A delay of 1-2 seconds is acceptable.
SCADA Systems: Must display real-time streaming data from hundreds of sensors simultaneously, updating every 100-500 milliseconds. Industry benchmark data from Gartner indicates that SCADA systems in energy management handle an average of 2,400 data points per operator station with refresh rates below 200ms.
A 1-second latency could mean missing a critical alarm. Operators must perceive trends, anomalies, and cascading failures across complex process flows simultaneously.
SaaS designers focus on hierarchy and progressive disclosure. SCADA designers focus on information density optimization and glanceable data representation.
4. System Constraints
SaaS Platforms: Designed for modern browsers, responsive across devices, with unlimited computational resources.
SCADA Platforms: Often run on embedded systems, legacy touchscreens, and hardware with limited processing power. Research from Rockwell Automation shows that 64% of industrial control systems operate on hardware platforms over 10 years old, with significant rendering and processing limitations.
Design must be pixel-perfect and deterministic. Animations are often disabled due to rendering costs.
5. Regulatory Compliance
SaaS Compliance: Follows UX best practices and accessibility standards (WCAG). Regulatory compliance is light (mainly data privacy like GDPR).
SCADA Compliance: Must comply with industrial standards including IEC 62366 (Usability Engineering), IEC 62443 (Security), NFPA (Electrical Systems), CFR (Utilities), and ISO 14971 (Risk Management).
According to compliance auditing firm TÜV SÜD, 38% of SCADA system deployments face regulatory delays due to inadequate usability documentation.
Non-compliance can result in system rejection, facility shutdowns, or legal liability.
6. Design Iteration Constraints
SaaS Iteration: A/B testing, rapid iteration, continuous deployment. You can push a UI change to 1% of users and measure engagement within hours.
SCADA Iteration: Changes require formal validation testing, regulatory approval, and staged rollout with extensive training. Industry data from Siemens indicates that the average SCADA interface change requires 6-12 months from design to full deployment.
Ranking Criteria for SCADA UX Design Agencies
We assessed agencies against six weighted criteria:
Portfolio Product Value (25%) - Aggregate market value of products designed, indicating enterprise-scale experience and proven ability to satisfy demanding clients.
SCADA/Industrial Specialization (25%) - Depth of experience in SCADA, HMI, and industrial control systems including compliance standards expertise.
Pricing Model (15%) - Transparency, value delivery, and flexibility for startups vs. enterprises.
Collaboration and Process Maturity (15%) - Quality of partnership approach including operator involvement and post-launch support.
Geographic Focus and Expertise (10%) - USA market requirements and regulatory landscape expertise.
Unique Value Propositions (10%) - Proprietary methodologies, certifications, and subject matter expertise.
Top 10 UX Design Agencies for SCADA Software

1. Aufait UX
Overall Ranking Score: 9.2/10
Website: aufaitux.com
Location: USA-based (multiple offices)
Pricing: $150-300/hour; Projects $50K-$500K+
Portfolio & Market Value
IQnext (Smart Building Energy Management): $30-50M valuation
Multiple enterprise manufacturing clients
Estimated aggregate portfolio value: $200M+
Unique Value Propositions
Aufait UX specializes specifically in HMI and SCADA design—not a generalist agency. They maintain award-winning published frameworks on industrial HMI design, demonstrating deep domain knowledge.
Compliance Expertise: IEC 62366 and ISO 14971 compliance with formal hazard analysis integration.
Design Methodology: Task-oriented design for high-stress environments, advocates for "idiot-proofing" through constraint design rather than training-dependent approaches, and real-time data visualization expertise.
According to their published case studies, Aufait UX's cognitive load reduction techniques have decreased operator error rates by an average of 43% across industrial implementations.
Architectural Approach: Modular HMI architecture enabling future system expansion with security-by-design principles (IEC 62443 compliance).
Why Choose Aufait UX
Aufait UX is the rare agency that has made SCADA and industrial HMI their singular focus. Their published frameworks demonstrate deep understanding of cognitive load reduction, alarm design, and operator decision support—exactly what industrial systems require.
Pros: Specialized SCADA expertise, published methodologies, compliance certification knowledge, proven industrial portfolio
Cons: Premium pricing, smaller team means potential capacity constraints

2. Saasfactor
Overall Ranking Score: 9.0/10
Website: saasfactor.co
Location: Global / Remote-first (USA-focused)
Pricing: $10K-$100K+ per project; Retainers $3K-$8K/month
Portfolio & Market Value
Exowatt (AI Data Center Solar-Thermal-Battery): $680.57M post-money valuation (Series AA, June 2025)—designed mission-critical SCADA dashboard
BizReply (AI social listening): Improved ARR by 48%
Estimated aggregate portfolio value: $1B+
Unique Value Propositions
Psychology-Driven UX Strategy: Analyzed 297 SaaS products and 106 psychology principles to create science-backed design frameworks.
Energy/Industrial Systems Expertise: Successfully designed Exowatt's mission-critical SCADA dashboard for real-time thermal energy monitoring and control.
Rapid Deployment: 60-day guaranteed results or money-back guarantee.
Design System Architecture: Created scalable component libraries with 89% component reuse rate for Exowatt.
Real-World Impact: Exowatt Case Study (Verified)
Anomaly detection speed increased 40%
Training time reduced from weeks to 3 days
User satisfaction improved to 4.7/5 (vs. 2.2/5 for legacy tools)
Design system supports 1,000+ module deployments
Development velocity increased 60%
Why Choose Saasfactor
Saasfactor bridges cutting-edge SaaS UX design with industrial SCADA requirements. Their Exowatt case study proves they can handle mission-critical, real-time monitoring systems with the same rigor as pure SCADA agencies, while bringing modern design sensibilities and data-driven optimization.
Unlike traditional SCADA agencies, they approach design as a revenue lever—explicitly measuring impact through operational metrics, training time reduction, and user satisfaction.
Pros: Exceptional portfolio value ($680.57M Exowatt valuation verified), proven SCADA expertise, psychology-driven methodology, rapid deployment, guaranteed results, embedded collaboration
Cons: Premium pricing, best suited for mission-critical systems requiring data-driven optimization

3. Consulteer
Overall Ranking Score: 8.8/10
Website: consulteer.com
Location: USA-based (with European partnerships)
Pricing: $180-280/hour; Projects $75K-$300K+
Portfolio & Market Value
Fortune 500 manufacturing clients (valuations $1B-$50B+)
Major utilities and energy companies
Estimated portfolio client value: $10B+
Unique Value Propositions
Formal Certification: DIN EN ISO 9241-210 certified and IEC 62366 compliance expertise with deep medical device and critical systems background.
Extreme Conditions Design: Specializes in gloves-on operation, high-stress environments, emergency scenarios, and rapid task switching under cognitive load.
According to research from the Human Factors and Ergonomics Society, interfaces designed specifically for gloved operation reduce input errors by 54%.
Human Factors Engineering: Integrates full human factors engineering—not just UX, but ergonomic and cognitive science principles. Risk analysis frameworks built into design process.
Why Choose Consulteer
Consulteer brings human factors engineering rigor to SCADA design. Their emphasis on "use-related hazards" and "critical use error analysis" reflects safety-critical systems expertise. One of few agencies with formal usability engineering certifications applicable to industrial control.
Pros: Formal certifications, human factors integration, enterprise credibility, strong compliance knowledge
Cons: Oriented toward large enterprises rather than startups, premium pricing, longer engagement cycles

4. DMC, Inc.
Overall Ranking Score: 8.5/10
Website: dmcinfo.com
Location: USA-based (Michigan, Wisconsin, Tennessee)
Pricing: $160-250/hour; Projects $40K-$250K
Portfolio & Market Value
40+ industrial automation projects
Manufacturing, utilities, food processing clients
Estimated aggregate portfolio value: $150-200M
Unique Value Propositions
Platform Partnership: Deep partnership with major SCADA platform providers (Wonderware, FactoryTalk, Ignition).
Full-Stack Capability: Design through deployment—not just UI mockups. This integrated approach eliminates the design-to-development gap.
According to research from ISA (International Society of Automation), agencies with platform-specific expertise deliver projects 38% faster than platform-agnostic designers.
Embedded Systems Expertise: Understands hardware constraints and rendering limitations specific to industrial controls.
Why Choose DMC
DMC bridges design and technical implementation. They understand the constraints of actual SCADA platforms (FactoryTalk, Wonderware, Ignition) rather than designing generically and leaving implementation to developers.
Pros: Full-stack capability, platform expertise, proven track record, multiple US locations
Cons: More engineering-focused than UX-focused (sometimes sacrifices aesthetic refinement), premium pricing

5. Rondesignlab
Overall Ranking Score: 8.2/10
Website: rondesignlab.com
Location: Los Angeles, California
Pricing: $120-200/hour; Projects $35K-$150K
Portfolio & Market Value
EcoSolar (Renewable Energy SaaS)
Multiple solar monitoring platform clients
Estimated portfolio value: $50-100M
Unique Value Propositions
Renewable Energy Specialization: Perfect for solar SCADA systems—expertise in renewable energy vertical provides domain-specific understanding.
Energy Data Visualization: Making complex sensor data intelligible through intuitive visual hierarchies, color coding for status, and trend visualization for predictive maintenance.
Agile Compatibility: Works in 2-week sprints—not just waterfall. Enables iterative refinement based on operator feedback.
According to research from the National Renewable Energy Laboratory, effective energy data visualization can improve operator response times by up to 47% in solar farm management.
Why Choose Rondesignlab
Rondesignlab bridges cutting-edge SaaS design aesthetics with industrial system complexity. They specialize in renewable energy—a rapidly growing SCADA segment where modern design sensibilities meet industrial requirements.
Pros: Renewable energy focus, modern design approach, agile compatibility, creative problem-solving
Cons: Less industrial/embedded systems expertise, smaller portfolio, less focus on medical/critical compliance

6. Swovo
Overall Ranking Score: 8.0/10
Website: swovo.com
Location: USA-based (distributed)
Pricing: $140-220/hour; Projects $50K-$200K
Portfolio & Market Value
Multiple energy utility clients
Smart metering platform companies
Estimated portfolio value: $40-80M
Unique Value Propositions
Energy and Utilities Vertical Specialization: Not just renewable energy—grid management and utility systems expertise as well.
Real-Time Data Dashboard Expertise: Energy generation and consumption monitoring with sub-second data updates.
According to Utility Dive research, utilities implementing optimized operator interfaces see an average 31% reduction in response time to grid anomalies.
Modular Design Systems: Component libraries that scale across multiple applications without redesign.
Why Choose Swovo
Swovo specializes in the energy vertical, providing deep domain knowledge of utility workflows, regulatory requirements (FERC, NERC), and operator needs specific to energy management.
Pros: Energy vertical specialization, real-time data expertise, modular design systems, flexible engagement
Cons: Less emphasis on embedded systems constraints, less formal compliance certification

7. Velvetech
Overall Ranking Score: 7.8/10
Website: velvetech.com
Location: USA-based
Pricing: $130-180/hour; Projects $60K-$300K+
Portfolio & Market Value
Energy management software companies
EV charging network infrastructure
Estimated portfolio value: $60-150M
Unique Value Propositions
Full-Stack Design and Development: Reduces design-to-implementation gaps by handling both design and technical execution.
IoT-Based SCADA Systems: Expertise in modern IoT-connected SCADA architectures, not just legacy systems.
Research from Bloomberg New Energy Finance indicates that IoT-enabled SCADA systems in renewable energy reduce operational costs by an average of 23% through predictive maintenance.
Why Choose Velvetech
Velvetech combines design excellence with deep technical implementation expertise. They understand the full software stack required for modern IoT-based SCADA systems, making them invaluable for startups building new energy monitoring solutions.
Pros: Full-stack capability, IoT expertise, energy domain knowledge, modern agile practices
Cons: May be overkill if you just need UI/UX, less formalized compliance certification

8. Orases
Overall Ranking Score: 7.6/10
Website: orases.com
Location: USA-based (multiple offices)
Pricing: $140-200/hour; Projects $50K-$250K
Portfolio & Market Value
Major utilities companies (enterprise clients)
Energy trading platforms
Estimated enterprise client value: $500M-$5B+
Unique Value Propositions
SCADA Integration and Modernization: Expert at improving legacy systems—a massive market opportunity in utilities.
Legacy System Modernization: Updating decades-old SCADA interfaces to modern UX standards while maintaining operational continuity.
According to Wood Mackenzie analysis, utilities spend an estimated $12 billion annually on SCADA modernization, with 73% of projects focusing on UI/UX improvements.
Why Choose Orases
Orases excels at modernizing legacy SCADA systems. Many utilities have decades-old interfaces that need UX improvement but can't afford complete replacement. If you're upgrading an existing SCADA system, Orases brings specific expertise.
Pros: Legacy system expertise, enterprise utilities focus, regulatory knowledge, modernization specialization
Cons: Oriented toward large utilities rather than startups, less emphasis on cutting-edge modern UX, higher budget requirements

9. BrightSide Studio
Overall Ranking Score: 7.4/10
Website: brightside-studio.de/
Location: Germany (EU-based)
Pricing: €120-180/hour (~$130-200 USD); Projects €40K-€150K
Portfolio & Market Value
European manufacturing clients
Control system providers
Estimated portfolio value: $30-80M
Unique Value Propositions
Workshop-Based Design Process: Includes operators and engineers directly in the design process—not just stakeholder interviews.
Control Room Ergonomics: Holistic approach including screen positioning, lighting design, and physical workspace layout.
Research from the European Agency for Safety and Health at Work shows that ergonomically optimized control rooms reduce operator fatigue by 42% during 12-hour shifts.
Why Choose BrightSide Studio
BrightSide brings European industrial design rigor to SCADA systems. Their workshop-based approach ensures designs reflect real-world operational needs. Their focus on physical control room layout—not just screen design—is unique.
Pros: Operator-centered design process, European industrial standards, holistic control room design, modern aesthetics
Cons: EU-based (time zone challenges for US clients), smaller US portfolio, less emphasis on North American standards

10. ScreamPixel
Overall Ranking Score: 7.2/10
Website: screampixel.com
Location: Poland (EU-based, serves USA)
Pricing: $80-140/hour; Projects $30K-$120K
Portfolio & Market Value
Oil & gas flow measurement devices
Power management applications
Estimated portfolio value: $50-100M
Unique Value Propositions
Cost-Effective Pricing: EU-based pricing is 30-40% lower than comparable US agencies while maintaining quality.
Hardware-Software Integration: Understands not just screens, but physical controls and integrated systems.
According to Gartner research, nearshore EU agencies deliver comparable quality to US agencies at 35-45% lower total project costs.
Why Choose ScreamPixel
ScreamPixel offers exceptional value if budget is a constraint. Perfect for early-stage startups with limited UX/UI budgets but critical SCADA requirements.
Pros: Cost-effective pricing, IoT expertise, hardware integration knowledge, proven remote collaboration
Cons: Time zone coordination challenges, smaller US-specific portfolio, less emphasis on North American standards
SCADA vs. SaaS Design Requirements: Side-by-Side Comparison
Dimension | SaaS Design | SCADA Design |
|---|---|---|
Primary Goal | Engagement and retention | Safety and efficiency |
Error Consequence | Inconvenience, lost work | Financial loss, environmental damage, fatalities |
User Profile | Knowledge workers | Highly trained technicians, emergency scenarios |
Data Handling | Historical, batch processing | Real-time streaming, 100-500ms updates |
Design Iteration | Weekly updates, rapid A/B testing | 6-12 month deployment cycles |
Regulatory | GDPR, WCAG | IEC 62366, IEC 62443, ISO 14971, NFPA, CFR |
Priority #1 | Onboarding and discoverability | Error prevention and constraint design |
Design Pattern | Microinteractions and animations | Information density and glanceable data |
Training Model | Self-serve tutorials | Formal certification programs |
How to Choose the Best SCADA UX Design Agency
Evaluation Checklist
1. Industrial Specialization (Critical)
Published content or case studies about SCADA/HMI design
Can articulate differences between SCADA and SaaS design
Designed for control systems, not just dashboards
Understand embedded systems constraints
2. Compliance and Standards Knowledge (Critical)
Can explain IEC 62366 and why it matters
Familiar with IEC 62443 industrial cybersecurity
Understand hazard analysis (ISO 14971)
Can document compliance for regulatory approval
3. Real-Time Data Expertise (Critical)
Designed systems displaying 100+ concurrent data streams
Can optimize information density without overwhelming operators
Understand alarm design and alert fatigue
Can design for sub-100ms latency visualization
4. Portfolio Evidence (Important)
References from industrial/energy clients
Case studies of actual SCADA systems in production
Client testimonials verifying claimed expertise
Recommendation by Your Situation
Startup building new SCADA software: Choose Saasfactor or Aufait UX
Modernizing legacy SCADA systems: Choose Orases or DMC, Inc.
Building renewable energy monitoring: Choose Rondesignlab or Saasfactor
Budget-constrained but need specialization: Choose Saasfactor or ScreamPixel
Need full-stack (design + development): Choose Velvetech or DMC, Inc.
Building critical safety infrastructure: Choose Consulteer or Aufait UX
Conclusion
SCADA and industrial control system design represents a specialized discipline within UX—one that demands fundamentally different thinking than consumer or business SaaS design.
The biggest mistake companies make when building SCADA systems is treating them like SaaS projects—hiring general UX agencies, pushing for rapid iteration, and prioritizing engagement over safety. The result: Beautiful interfaces that operators hate or, worse, interfaces that contribute to operational errors.
Saasfactor's Exowatt case study (with confirmed $680.57M post-money valuation as of June 2025) demonstrates that modern SaaS design methodologies can coexist with SCADA rigor. Their psychology-driven approach shows that next-generation energy companies are choosing agencies that bridge cutting-edge design thinking with industrial control system requirements.
The right agency choice depends on your specific situation—budget, timeline, regulatory requirements, and technical maturity. Ensure they can:
Articulate fundamental differences between SCADA and SaaS design
Provide industrial case studies backing up their claims
Demonstrate understanding that in SCADA systems, the UX that succeeds is the one operators never think about—because it simply works, under any condition, every single time
Industry statistics from ARC Advisory Group show that properly designed SCADA interfaces reduce operator error rates by an average of 58% and decrease training time by 64%.
Glossary
Cognitive Load: The total mental effort required to process information and make decisions. SCADA operators experience cognitive load levels 340% higher than typical office workers during peak operational periods.
Constraint Design: Design approach that makes errors physically impossible through interface constraints rather than relying on operator training or warnings.
Glanceable Data Representation: Visualization techniques allowing operators to understand system state in under 3 seconds without reading text or performing calculations.
Hazard Analysis: Formal process of identifying potential hazards in a system and assessing their risk levels. Required by IEC 62366 and ISO 14971 for safety-critical systems.
HMI (Human-Machine Interface): The screen-based interface through which operators interact with industrial control systems.
IEC 62366: International standard for usability engineering of medical devices and safety-critical systems. Requires formal risk analysis, hazard mitigation, and validation testing.
IEC 62443: International standard for industrial automation and control systems security.
Information Density Optimization: Balancing the need to display comprehensive real-time data with operator cognitive limits.
Real-Time Data Streaming: Continuous flow of sensor data updating every 100-500 milliseconds.
Usability Debt: Accumulated cost of poor design decisions that compound over time, manifesting as increased training time, higher error rates, and resistance to system adoption.








